Rainwater-Harvesting Sizing Study for a College Campus from Measured Catchment Data

Survey campus rooftops, measure real rainfall and runoff coefficients, and size storage and recharge structures per CGWB and BWSSB guidance

Mapped to your syllabusVTU 2022 Scheme (OBE/CBCS) · BXX685 Major Project Phase-I · Semester 6

Overview

1 min read

Campus RWH Sizing is a field-measurement study that turns rainwater harvesting from a compliance checkbox into measured engineering. The team surveys every harvestable rooftop on their own college campus — plan areas, surface types, downpipe locations — installs a graduated rain gauge, and runs a barrel-catch rig: roof downpipes divert into calibrated drums so that, storm by storm, real runoff volumes against rainfall depth and catchment area yield experimentally measured runoff coefficients per surface type (GI sheet, RCC slab, tiled roof).

Those measurements feed the sizing study. Using rainfall statistics from the IMD Data Supply Portal and KSNDMC, the team computes dependable monsoon rainfall, applies its measured coefficients instead of textbook ones, and sizes storage tanks and a recharge structure per the CGWB Manual on Artificial Recharge and the BWSSB rules that make such systems mandatory for new buildings in Bengaluru. A first-flush diverter study and basic water-quality tests (pH, turbidity, TDS) on the harvested water complete the engineering picture, and a cost-per-kilolitre comparison against the campus's tanker purchases states the case in rupees.

The honesty of the project is its method: every formula in the sizing report is fed by a number the team measured on their own campus, and every assumption — dependable rainfall, filter efficiency, percolation rate — is stated with its source. It is buildable within one monsoon season on consumables under ₹3,500, uses laboratories the department already owns, and ends with a recommendation the college administration can act on.

Relevant for
Karnataka
Level
Intermediate · 14 weeks · team of 4
Common at
Visvesvaraya Technological University, APJ Abdul Kalam Technological University, Anna University, Chennai
Updated
Nov 2026

Syllabus alignment

VTU · 2022 Scheme (OBE/CBCS)

BXX685 · Major Project Phase-I · Semester 6 · 2 credits · CIE 100

Subjects this project applies
  • Engineering hydrology (rainfall analysis, catchments, runoff)
  • Water supply and sanitary engineering (storage, first-flush, recharge structures)
  • Surveying laboratory (catchment area measurement and mapping)
  • Environmental engineering laboratory (pH, turbidity, TDS of harvested water)
  • Python / Excel (rainfall statistics, sizing and cost calculations)
How it is evaluated

Team: individual or group ≤ 4, single- or multi-disciplinary

report : presentation : Q&A = 50 : 25 : 25; same report marks for all batch-mates

Also fits: KTU 2019 Scheme, Anna University Regulation 2021.

What's in the box

11 parts · 5 free · 3 previewed · 3 unlock for ₹2,000

Problem & synopsis

5 min read

Problem statement

Bengaluru and much of Karnataka face recurring water stress: groundwater falls, tankers get costlier every summer, and the BWSSB mandates rainwater harvesting for new buildings above threshold plot sizes — yet the harvesting systems that do exist are frequently sized by rule of thumb. Student-scale studies and many real installations use textbook runoff coefficients that no one measured on the actual roof, an annual-average rainfall figure that hides the monsoon's concentration, and tank sizes inherited from a contractor's habit rather than computed from demand and dependable supply.

The result is hardware that underperforms: tanks that overflow unused for months, recharge pits sized without percolation data, and no economic argument that survives scrutiny. There is a need for a measured campus rainwater-harvesting sizing study — surveyed catchments, on-site rain gauge, experimentally determined runoff coefficients and percolation rate, first-flush and quality checks, and storage and recharge structures sized per CGWB and BWSSB guidance — ending in a costed recommendation the college can actually implement.

Synopsis

Abstract

Rainwater harvesting is mandated in Bengaluru for new buildings above threshold plot sizes, yet student projects usually size systems from textbook runoff coefficients and a single annual-rainfall figure. This study measures first: ten years of local rainfall statistics from IMD/KSNDMC data, a full rooftop catchment survey of the campus, and storm-by-storm runoff coefficients measured with a barrel-catch rig on two surface types. Those inputs size storage tanks and a recharge structure per CGWB manual guidance and BWSSB rules, with first-flush and water-quality checks, and a cost-per-kL comparison against the campus's tanker water purchases. Consumables cost under ₹3,500; the deliverable is a defensible sizing report the administration can implement.

Introduction

Bengaluru's water reality — falling groundwater, costly tankers, and a BWSSB mandate for harvesting in new construction — makes the campus an ideal live laboratory. The engineering content is genuinely hydrological: how much rain falls, how much runs off each roof type, how much must be stored to bridge dry spells versus recharged, and what it costs per kilolitre compared with buying water.

Existing System

  • Sizing in student work and many real proposals uses literature coefficients and annual averages, with no measurement on the actual catchment.
  • The campus has scattered harvesting hardware with no sizing documentation and no measured performance.
  • Administration decisions are driven by compliance forms rather than by yield and payback numbers.
  • Limitations: unmeasured catchments, borrowed coefficients, and no defensible answer to 'is this tank the right size?'

Proposed System

  • Rainfall analysis: ten-plus years of monthly data from IMD and KSNDMC, plus on-campus gauge readings; averages, monsoon concentration and a stated dependable rainfall for design.
  • Catchment survey: every rooftop measured and mapped (tape/total station), classified by surface type and drainage, with a catchment table and a scaled sketch plan.
  • Measured runoff: a barrel-catch rig on two contrasting roof sections; per significant storm, volume against depth and area gives experimental coefficients, compared with literature.
  • First flush and quality: diverted first-flush volumes recorded; pH, turbidity and TDS tested in the environmental lab on pre- and post-filter samples.
  • Sizing and economics: storage by demand-buffer and supply methods, recharge sized per CGWB guidance with a measured percolation test, and a cost-per-kL comparison against tanker water, with the recommended storage-recharge split.

Feasibility Study

  • Technical: the chain uses standard surveying and lab instruments plus calibrated drums; rainfall data comes from IMD at modest cost, supplemented by KSNDMC public data. The monsoon calendar drives the schedule — the rig must run by June — handled by front-loading preparation.
  • Economic: gauge, drums, diverter piping, filter media and test consumables total roughly ₹3,000–3,500; IMD data for one station is inexpensive; no equipment purchase is needed.
  • Operational: measurements happen on the team's own campus with maintenance-section cooperation. Fieldwork is outdoors in daylight, under a written two-person safety note — wet surfaces avoided, ladders handled by maintenance staff only. The deliverable doubles as a real recommendation to the college.

Objectives

  1. 01Compile and analyse ten-plus years of local rainfall (IMD Data Supply Portal / KSNDMC station data) into monthly statistics, monsoon concentration and a stated dependable design rainfall.
  2. 02Survey and map every harvestable rooftop on campus: plan areas, surface types (GI sheet, RCC, tiled), slopes and downpipe locations, producing a catchment table and scaled sketch.
  3. 03Measure storm-event runoff from two contrasting roof sections with a calibrated barrel-catch rig and derive experimental runoff coefficients per surface type.
  4. 04Record first-flush volumes per storm and test pH, turbidity and TDS of harvested water before and after a simple filter, in the environmental laboratory.
  5. 05Conduct a percolation test at the proposed recharge site and size the recharge pit or trench per CGWB manual guidance.
  6. 06Size storage capacity by both demand-buffer and supply-side methods using measured inputs, and recommend a storage-versus-recharge split for the campus.
  7. 07Compute harvested yield, reliability and cost per kilolitre, and compare against the campus's tanker-purchase records as an economic case.
  8. 08Deliver a sizing report and recommendation pack (drawings, calculations, costs) suitable for submission to the college administration.

Scope

In scope

  • The team's own college campus: its rooftops, downpipes and one proposed recharge site.
  • One study season of on-campus rainfall and storm-runoff measurement, plus ten-plus years of procured rainfall statistics.
  • Barrel-catch coefficient measurement on two roof types; first-flush quantification; basic water-quality tests (pH, turbidity, TDS).
  • Sizing of storage tanks and one recharge structure per CGWB/BWSSB guidance, with an economic comparison to tanker purchases.

Out of scope (v1)

  • Construction or installation of the recommended structures — the deliverable is the sizing and recommendation pack, executed by the college later.
  • Drinking-water treatment design and potable certification of harvested water; the quality study stops at basic parameters.
  • Sewage-treatment plant effluent recycling, greywater systems and landscape demand modelling beyond a stated demand figure.
  • Groundwater-model simulation of aquifer response to recharge, and any off-campus catchments.

Methodology

The study uses a sequential field-research design: hydrological data first, catchment survey second, measurement campaign third, sizing and economics last — each stage gating the next, with the monsoon calendar explicitly planned around.

PhaseWeeksActivitiesDeliverable
Literature & data acquisition1–3Study RWH design references; order/receive IMD station data; compile KSNDMC monthly series; set up the on-campus gaugeRainfall analysis note
Catchment survey4–5Measure and map all rooftops; classify surfaces; photograph downpipes; build the catchment tableCatchment survey pack
Rig preparation5–6Install drums and diverter on two downpipes; calibrate drum levels; rehearse the storm-sampling drill with maintenance sectionCalibrated rig + drill note
Measurement campaign6–11 (monsoon)Record storms: gauge depth, drum volumes, first-flush volumes; sample quality pre/post filter; log per-storm data sheetsStorm dataset
Percolation test8Pit-fill test at the proposed recharge site, repeated three timesPercolation report
Sizing & analysis12–13Dependable-rainfall sizing; tank and recharge calculations with measured coefficients; economics vs tanker recordsSizing calculations
Documentation & viva prep14Report, recommendation pack, PPT, demo rehearsalSubmission

Quality control: the gauge is read at fixed times daily and after every significant storm by a logged rota; drum readings are taken at level-eye with a graduated dipstick and cross-checked once per month against a second drum; every storm gets a one-page data sheet (start, depth, volumes, anomalies). Coefficients from storms under 5 mm are excluded as unreliable, and the report states how many storms survived that filter — examiners probe exactly this measurement-honesty.

Study design

1 diagram · 5 tools · 1 min read

  • Graduated rain gauge and storm-event logging (manual + drum recordings)
  • Survey tools: tape, compass / Abney level (or department total station)
  • Barrel-catch runoff test rig (roof downpipe into calibrated drums)
  • Excel / Python (runoff coefficients, storage and recharge sizing)
  • Environmental laboratory (pH, turbidity, TDS of harvested water)

This is a field study, so the architecture is the measurement-to-sizing data chain, drawn as the study design.

flowchart TD
  IMD["IMD / KSNDMC: 10+ years monthly rainfall"] --> RA["Rainfall statistics: averages, monsoon share, dependable design rainfall"]
  GAUGE["On-campus rain gauge (study season)"] --> RA
  SURVEY["Rooftop survey: areas, surface types, downpipes"] --> CT["Catchment table (m2 by type)"]
  RIG["Barrel-catch rig on two roof sections"] --> COEF["Measured runoff coefficients per surface type"]
  GAUGE --> COEF
  FF["First-flush volumes + filter media test"] --> WQ["pH, turbidity, TDS: pre- and post-filter"]
  RA --> SIZE["Sizing: storage by demand-buffer and supply methods"]
  CT --> SIZE
  COEF --> SIZE
  PERC["Percolation test at recharge site"] --> RE["Recharge pit/trench sizing per CGWB manual"]
  SIZE --> ECO["Economics: kL harvested, cost per kL vs tanker records"]
  RE --> ECO
  ECO --> REC["Recommendation pack: drawings, calculations, costs"]

Three decisions carry the design. First, measured coefficients replace textbook ones in every sizing calculation, with the comparison to literature values reported — that substitution is the study's core contribution. Second, the dependable design rainfall is stated explicitly (with its return logic) rather than using the annual average, because sizing on averages systematically under-provisions storage in a monsoon climate. Third, the economics use the campus's own tanker-purchase records — real rupees the college already spends — so the recommendation lands as a business case, not a slogan.

Work packages

5 packages

  1. Package 01

    Rainfall Data & Statistics (Member A)

    Procures the IMD station series and compiles KSNDMC data, runs the on-campus gauge with a logged reading rota, computes monthly statistics, monsoon concentration and the dependable design rainfall, and documents every data source and gap for the appendix.

  2. Package 02

    Catchment Survey & Mapping (Member B)

    Measures and maps every harvestable rooftop — plan areas by tape or the department total station, surface classification, slopes and downpipe locations — and produces the scaled sketch plan, the catchment table in square metres by type, and the photo log.

  3. Package 03

    Runoff & Quality Measurement (Member C)

    Builds and calibrates the barrel-catch rig, runs the storm-sampling drill with the maintenance section, records per-storm volumes and first-flush quantities, collects pre/post-filter samples for the environmental-lab tests, and maintains the storm data sheets.

  4. Package 04

    Sizing & Economics (Member D)

    Conducts the percolation test, performs the storage and recharge sizing per CGWB and BWSSB guidance using the team's measured inputs, builds the cost-per-kL comparison against tanker records, and assembles the recommendation pack with drawings and calculation sheets.

  5. Package 05

    Field Coordination & Review (shared)

    All four members share the daily gauge rota, each leads storm sampling at least twice, and the team holds a weekly data review where anomalies are resolved on the sheet — the discipline that makes a monsoon-season field dataset defensible in the viva.

Slides

12 slides · titles free · bullets, notes and the .pptx unlock

  1. Slide 1

    Rainwater-Harvesting Sizing Study for a College Campus from Measured Catchment Data

  2. Slide 2

    Motivation

  3. Slide 3

    Problem Statement

  4. Slide 4

    Existing vs Proposed

  5. Slide 5

    Objectives

  6. Slide 6

    Study Design

  7. Slide 7

    Runoff Coefficient Measurement

  8. Slide 8

    Sizing Method

  9. Slide 9

    Water Quality & First Flush

  10. Slide 10

    Economics

  11. Slide 11

    Individual Contributions

  12. Slide 12

    Conclusion & Future Scope

Bullets, speaker notes and the .pptx · ₹2,000

The titles above are the real outline. The rest is what you present from.

Unlock for ₹2,000

Viva questions & answers

3 of 17 answered free · 14 unlock

Read each answer, close it, and say it in your own words. Your viva will ask. Now you'll know.

  1. 01Concept

    What is a runoff coefficient and why does it matter so much in sizing?

    It is the fraction of rainfall on a catchment that actually becomes harvestable runoff — everything else soaks, wets or stays on the surface. Every sizing calculation multiplies rainfall depth by catchment area by this coefficient, so an error in it propagates directly into tank and recharge volumes, which is why we measured ours per surface type instead of borrowing a textbook range.

  2. 02Concept

    Why did you use dependable rainfall rather than the annual average for design?

    The annual average hides both the monsoon's concentration in a few months and the year-to-year variability; a tank sized on the average sits empty more often than its design promise suggests. Dependable rainfall — the depth exceeded in most years — sizes the system for what the catchment can reliably deliver, and we state the dependable value and its logic explicitly in the report rather than burying it in a calculation.

  3. 03Concept

    What is first flush and why did you quantify it instead of just fitting a diverter?

    The first millimetres of any storm wash dust, leaves and deposits off the roof, so the earliest runoff is the dirtiest. A diverter discards it, but how much to discard is a design number, not a habit: we recorded per-storm first-flush volumes and the quality jump across the diverter, so our diverter sizing comes from measured turbidity improvement on this campus rather than from a rule-of-thumb figure.

+14 more questions, with answers

Try the free ones out loud first. Your examiner will not accept “it's in the PPT”.

How to reproduce the study

6 steps · unlocks with the project

Unlocks with the project · ₹2,000

6 steps

Every step to carry the project out with the tools in the tech stack, in order.

Unlock for ₹2,000

READMEFIRST

269 words · unlocks with the project

What to change before it goes anywhere near a submission. Skipping it is how the demo fails live.

Unlocks with the project · ₹2,000

269 words · ~1 min read

The checklist of things to rename, re-seed and re-think so the project reads as yours.

Unlock for ₹2,000

Instructions

346 words · unlocks with the project

How to study it, adapt it and walk your examiner through it, step by step.

Unlocks with the project · ₹2,000

346 words · ~2 min read

Report structure, formatting rules and the submission checklist your department will grade.

Unlock for ₹2,000

References

6 sources

  1. CGWB / Ministry of Jal Shakti — Manual on Artificial Recharge to Ground Water (recharge structure design and percolation practice)
  2. BWSSB — Rain Water Harvesting (mandate, rules and guidance for Bengaluru buildings)
  3. India Meteorological Department — Data Supply Portal, National Data Centre, Pune (historical station rainfall data)
  4. Karnataka State Natural Disaster Monitoring Centre (KSNDMC) — state rainfall monitoring and data
  5. K. Subramanya, Engineering Hydrology, 4th ed., McGraw-Hill (rainfall analysis and runoff coefficient theory)
  6. CPHEEO, Ministry of Housing and Urban Affairs — Manual on Water Supply and Treatment (storage and demand practice)

Cite this bundle

OnlyProjects. (2026). Rainwater-Harvesting Sizing Study for a College Campus from Measured Catchment Data: B.Tech / B.E. Environmental Engineering project bundle [Educational resource]. https://onlyprojects.online/projects/btech-env-campus-rainwater-harvesting-sizing-study

Future scope

1 min read

  • Post-implementation monitoring: after the college builds the recommended structures, instrument the tank level and recharge pit and compare actual yield against this study's prediction — a ready-made Phase-II for a successor team.
  • Automated logging: replace manual gauge and drum readings with a tipping-bucket logger and ultrasonic tank sensor for continuous data.
  • Demand-side modelling: extend the study to metered hostel and lab water demand patterns, matching harvested supply against a real demand curve rather than a single figure.
  • Multi-source campus water balance: combine rainfall harvesting, borewell and tanker sources into one campus water-balance model with reuse scenarios.
  • Neighbourhood extension: apply the same measured method to a neighbouring government school or Anganwadi as a community-outreach extension of the recommendation pack.

Keep browsing

Same degree, same syllabus slot, different idea. Pick the one your guide will actually approve.

B.Tech / B.E.Code included

Aerospace / Aeronautical

Low-Speed Open-Circuit Wind Tunnel with Force Balance for Aerofoil Lift-Drag Measurement

Build a subsonic test tunnel on a student budget, then trace lift and drag on a 3D-printed NACA 0012 against theory

  • C / Arduino Uno (industry-standard extra) — HX711 load-cell and serial logging firmware
  • Python (NumPy, Matplotlib) — calibration, force coefficients and plots
  • MATLAB / Scilab — thin-airfoil theory overlay and regression
  • +4

intermediate14 wk4 students