Survey campus rooftops, measure real rainfall and runoff coefficients, and size storage and recharge structures per CGWB and BWSSB guidance
Mapped to your syllabusVTU 2022 Scheme (OBE/CBCS) · BXX685 Major Project Phase-I · Semester 6Campus RWH Sizing is a field-measurement study that turns rainwater harvesting from a compliance checkbox into measured engineering. The team surveys every harvestable rooftop on their own college campus — plan areas, surface types, downpipe locations — installs a graduated rain gauge, and runs a barrel-catch rig: roof downpipes divert into calibrated drums so that, storm by storm, real runoff volumes against rainfall depth and catchment area yield experimentally measured runoff coefficients per surface type (GI sheet, RCC slab, tiled roof).
Those measurements feed the sizing study. Using rainfall statistics from the IMD Data Supply Portal and KSNDMC, the team computes dependable monsoon rainfall, applies its measured coefficients instead of textbook ones, and sizes storage tanks and a recharge structure per the CGWB Manual on Artificial Recharge and the BWSSB rules that make such systems mandatory for new buildings in Bengaluru. A first-flush diverter study and basic water-quality tests (pH, turbidity, TDS) on the harvested water complete the engineering picture, and a cost-per-kilolitre comparison against the campus's tanker purchases states the case in rupees.
The honesty of the project is its method: every formula in the sizing report is fed by a number the team measured on their own campus, and every assumption — dependable rainfall, filter efficiency, percolation rate — is stated with its source. It is buildable within one monsoon season on consumables under ₹3,500, uses laboratories the department already owns, and ends with a recommendation the college administration can act on.
Syllabus alignment
Bengaluru and much of Karnataka face recurring water stress: groundwater falls, tankers get costlier every summer, and the BWSSB mandates rainwater harvesting for new buildings above threshold plot sizes — yet the harvesting systems that do exist are frequently sized by rule of thumb. Student-scale studies and many real installations use textbook runoff coefficients that no one measured on the actual roof, an annual-average rainfall figure that hides the monsoon's concentration, and tank sizes inherited from a contractor's habit rather than computed from demand and dependable supply.
The result is hardware that underperforms: tanks that overflow unused for months, recharge pits sized without percolation data, and no economic argument that survives scrutiny. There is a need for a measured campus rainwater-harvesting sizing study — surveyed catchments, on-site rain gauge, experimentally determined runoff coefficients and percolation rate, first-flush and quality checks, and storage and recharge structures sized per CGWB and BWSSB guidance — ending in a costed recommendation the college can actually implement.
Rainwater harvesting is mandated in Bengaluru for new buildings above threshold plot sizes, yet student projects usually size systems from textbook runoff coefficients and a single annual-rainfall figure. This study measures first: ten years of local rainfall statistics from IMD/KSNDMC data, a full rooftop catchment survey of the campus, and storm-by-storm runoff coefficients measured with a barrel-catch rig on two surface types. Those inputs size storage tanks and a recharge structure per CGWB manual guidance and BWSSB rules, with first-flush and water-quality checks, and a cost-per-kL comparison against the campus's tanker water purchases. Consumables cost under ₹3,500; the deliverable is a defensible sizing report the administration can implement.
Bengaluru's water reality — falling groundwater, costly tankers, and a BWSSB mandate for harvesting in new construction — makes the campus an ideal live laboratory. The engineering content is genuinely hydrological: how much rain falls, how much runs off each roof type, how much must be stored to bridge dry spells versus recharged, and what it costs per kilolitre compared with buying water.
In scope
Out of scope (v1)
The study uses a sequential field-research design: hydrological data first, catchment survey second, measurement campaign third, sizing and economics last — each stage gating the next, with the monsoon calendar explicitly planned around.
| Phase | Weeks | Activities | Deliverable |
|---|---|---|---|
| Literature & data acquisition | 1–3 | Study RWH design references; order/receive IMD station data; compile KSNDMC monthly series; set up the on-campus gauge | Rainfall analysis note |
| Catchment survey | 4–5 | Measure and map all rooftops; classify surfaces; photograph downpipes; build the catchment table | Catchment survey pack |
| Rig preparation | 5–6 | Install drums and diverter on two downpipes; calibrate drum levels; rehearse the storm-sampling drill with maintenance section | Calibrated rig + drill note |
| Measurement campaign | 6–11 (monsoon) | Record storms: gauge depth, drum volumes, first-flush volumes; sample quality pre/post filter; log per-storm data sheets | Storm dataset |
| Percolation test | 8 | Pit-fill test at the proposed recharge site, repeated three times | Percolation report |
| Sizing & analysis | 12–13 | Dependable-rainfall sizing; tank and recharge calculations with measured coefficients; economics vs tanker records | Sizing calculations |
| Documentation & viva prep | 14 | Report, recommendation pack, PPT, demo rehearsal | Submission |
Quality control: the gauge is read at fixed times daily and after every significant storm by a logged rota; drum readings are taken at level-eye with a graduated dipstick and cross-checked once per month against a second drum; every storm gets a one-page data sheet (start, depth, volumes, anomalies). Coefficients from storms under 5 mm are excluded as unreliable, and the report states how many storms survived that filter — examiners probe exactly this measurement-honesty.
This is a field study, so the architecture is the measurement-to-sizing data chain, drawn as the study design.
flowchart TD
IMD["IMD / KSNDMC: 10+ years monthly rainfall"] --> RA["Rainfall statistics: averages, monsoon share, dependable design rainfall"]
GAUGE["On-campus rain gauge (study season)"] --> RA
SURVEY["Rooftop survey: areas, surface types, downpipes"] --> CT["Catchment table (m2 by type)"]
RIG["Barrel-catch rig on two roof sections"] --> COEF["Measured runoff coefficients per surface type"]
GAUGE --> COEF
FF["First-flush volumes + filter media test"] --> WQ["pH, turbidity, TDS: pre- and post-filter"]
RA --> SIZE["Sizing: storage by demand-buffer and supply methods"]
CT --> SIZE
COEF --> SIZE
PERC["Percolation test at recharge site"] --> RE["Recharge pit/trench sizing per CGWB manual"]
SIZE --> ECO["Economics: kL harvested, cost per kL vs tanker records"]
RE --> ECO
ECO --> REC["Recommendation pack: drawings, calculations, costs"]Three decisions carry the design. First, measured coefficients replace textbook ones in every sizing calculation, with the comparison to literature values reported — that substitution is the study's core contribution. Second, the dependable design rainfall is stated explicitly (with its return logic) rather than using the annual average, because sizing on averages systematically under-provisions storage in a monsoon climate. Third, the economics use the campus's own tanker-purchase records — real rupees the college already spends — so the recommendation lands as a business case, not a slogan.
Package 01
Procures the IMD station series and compiles KSNDMC data, runs the on-campus gauge with a logged reading rota, computes monthly statistics, monsoon concentration and the dependable design rainfall, and documents every data source and gap for the appendix.
Package 02
Measures and maps every harvestable rooftop — plan areas by tape or the department total station, surface classification, slopes and downpipe locations — and produces the scaled sketch plan, the catchment table in square metres by type, and the photo log.
Package 03
Builds and calibrates the barrel-catch rig, runs the storm-sampling drill with the maintenance section, records per-storm volumes and first-flush quantities, collects pre/post-filter samples for the environmental-lab tests, and maintains the storm data sheets.
Package 04
Conducts the percolation test, performs the storage and recharge sizing per CGWB and BWSSB guidance using the team's measured inputs, builds the cost-per-kL comparison against tanker records, and assembles the recommendation pack with drawings and calculation sheets.
Package 05
All four members share the daily gauge rota, each leads storm sampling at least twice, and the team holds a weekly data review where anomalies are resolved on the sheet — the discipline that makes a monsoon-season field dataset defensible in the viva.
Slide 1
Rainwater-Harvesting Sizing Study for a College Campus from Measured Catchment Data
Slide 2
Motivation
Slide 3
Problem Statement
Slide 4
Existing vs Proposed
Slide 5
Objectives
Slide 6
Study Design
Slide 7
Runoff Coefficient Measurement
Slide 8
Sizing Method
Slide 9
Water Quality & First Flush
Slide 10
Economics
Slide 11
Individual Contributions
Slide 12
Conclusion & Future Scope
Bullets, speaker notes and the .pptx · ₹2,000
Read each answer, close it, and say it in your own words. Your viva will ask. Now you'll know.
It is the fraction of rainfall on a catchment that actually becomes harvestable runoff — everything else soaks, wets or stays on the surface. Every sizing calculation multiplies rainfall depth by catchment area by this coefficient, so an error in it propagates directly into tank and recharge volumes, which is why we measured ours per surface type instead of borrowing a textbook range.
The annual average hides both the monsoon's concentration in a few months and the year-to-year variability; a tank sized on the average sits empty more often than its design promise suggests. Dependable rainfall — the depth exceeded in most years — sizes the system for what the catchment can reliably deliver, and we state the dependable value and its logic explicitly in the report rather than burying it in a calculation.
The first millimetres of any storm wash dust, leaves and deposits off the roof, so the earliest runoff is the dirtiest. A diverter discards it, but how much to discard is a design number, not a habit: we recorded per-storm first-flush volumes and the quality jump across the diverter, so our diverter sizing comes from measured turbidity improvement on this campus rather than from a rule-of-thumb figure.
+14 more questions, with answers
Unlocks with the project · ₹2,000
Unlock for ₹2,000What to change before it goes anywhere near a submission. Skipping it is how the demo fails live.
Unlocks with the project · ₹2,000
Unlock for ₹2,000How to study it, adapt it and walk your examiner through it, step by step.
Unlocks with the project · ₹2,000
Unlock for ₹2,000OnlyProjects. (2026). Rainwater-Harvesting Sizing Study for a College Campus from Measured Catchment Data: B.Tech / B.E. Environmental Engineering project bundle [Educational resource]. https://onlyprojects.online/projects/btech-env-campus-rainwater-harvesting-sizing-study
Keep browsing
Same degree, same syllabus slot, different idea. Pick the one your guide will actually approve.
Cyber Security
Flows, top talkers and scan indicators for the lab's own network — headers only, no blocking, full history
Mechanical Engineering
A human-powered spiked-roller dehusker for small coconut growers around Pollachi — designed, fabricated and tested for ₹ under 20,000
Aerospace / Aeronautical
Build a subsonic test tunnel on a student budget, then trace lift and drag on a 3D-printed NACA 0012 against theory
Agricultural Engineering
Irrigates vegetable beds by soil-moisture thresholds instead of habit, and proves every litre with a flow meter
Artificial Intelligence & Machine Learning
Forecasts kharif yield for Karnataka districts from six decades of ICRISAT district data and tells extension officers which crops look safe this season
Artificial Intelligence & Machine Learning
Screens CPCB river-water samples into quality bands, flags stations that fail bathing criteria and predicts likely BOD exceedance when lab results are missing