Skip to content
OnlyProjects
M.Com · Accounting & FinanceFor educational purposes only

Input Tax Credit under GST: A Compliance-Workload Study of a Modelled Mid-Size Manufacturing Company

Twelve simulated months of purchase invoices run through the CGST rulebook — where the credit leaks, and what it costs to catch it

Mapped to your syllabusUniversity of Madras PG CBCS · Project · Semester 4

Overview

1 min read

Input tax credit (ITC) is the mechanism that makes GST a tax on value added, but it is conditional credit: Section 16 of the CGST Act attaches conditions — possession of a tax invoice, receipt of goods, tax paid to the government, return filed — Section 16(2)(aa) requires the supplier's invoice to appear in the buyer's GSTR-2B, Rule 36(4) caps availment at the credit shown in that auto-drafted statement, Rule 37 forces reversal when payment to the supplier crosses 180 days, and Section 17(5) blocks certain credits outright. Each condition turns the buyer's accountant into a monitor of other people's filing discipline.

This M.Com project quantifies what that monitoring takes. A modelled mid-size manufacturing company (a fictitious firm, Vaigai Precision Components Private Limited, turnover ₹25 crore, hence within the e-invoicing threshold) is simulated for twelve months (FY 2024–25): about 720 purchase invoices from 36 suppliers in three compliance archetypes — prompt GSTR-1 filers, delayed filers and composition/unregistered vendors — and 480 sales invoices with payment lags that push some past 180 days. The conditions are coded as a rule engine in Excel, applied invoice by invoice, and three result families are measured: ITC deferred or lost by cause, monthly reconciliation workload in man-hours under a manual process versus a template-assisted process, and the association between supplier archetype and mismatch type (chi-square). It uses only synthetic data and public law, fits the University of Madras Semester 4 Project format, and produces a workbook the examiner can interrogate line by line.

Relevant for
Tamil Nadu
Level
Intermediate · 16 weeks · solo
Common at
University of Madras, Bengaluru City University
Updated
Nov 2026

Syllabus alignment

University of Madras · PG CBCS

Project · Semester 4 · 2 credits · 100 = 20 internal (best 2 of 3 presentations) + 60 report + 20 viva

Subjects this project applies
  • Goods and Services Tax / Indirect Taxation (CGST Act eligibility and procedures)
  • Advanced Corporate Accounting (credit accounting and reversals)
  • Cost and Management Accounting (activity-wise workload costing)
  • Research Methodology and Statistical Tools (chi-square, cross-tabulation)
  • Computer Applications in Commerce (Excel modelling, Tally registers)
How it is evaluated

See your department's project guidelines.

Also fits: BCU B.Com SEP 2024.

What's in the box

11 parts · 5 free · 3 previewed · 3 unlock for ₹999

Problem & synopsis

6 min read

Problem statement

A mid-size manufacturer earns input tax credit of several lakh rupees a month, but the credit it may actually take depends on thirty-odd suppliers' filing behaviour and on its own payment discipline. Under Rule 36(4) read with Section 16(2)(aa), invoices that do not appear in the buyer's GSTR-2B cannot be availed; under Rule 37, payments outstanding beyond 180 days trigger reversal with re-credit only on payment; under Section 17(5), some inputs are simply ineligible. The accounts office must therefore reconcile the purchase register with GSTR-2B every month, chase suppliers, track ageing of supplier payments and maintain reversal-and-reclaim records — all before GSTR-3B is filed. Firms do this work, but its scale, its cost in man-hours and the value of credit it protects are rarely measured, so managements treat compliance staffing as overhead rather than as protection of working capital. The problem addressed by this study is to quantify, for a fully specified modelled company, the ITC deferred, reversed or lost under each statutory condition, and the workload of the reconciliation that protects the rest, and to test whether supplier filing behaviour explains the pattern of mismatches.

Synopsis

Abstract

This study simulates the input-tax-credit compliance cycle of a modelled mid-size manufacturing company over twelve months to measure how the statutory conditions in the CGST Act and Rules translate into deferred credit, reversals and accounting workload. A synthetic invoice population with three supplier-compliance archetypes is generated, a rule engine implementing Section 16 conditions, Rule 36(4), Rule 37 and Section 17(5) is built in Excel, and outcomes are measured invoice by invoice. Reconciliation workload is costed in man-hours for manual and template-assisted processes, and the association between supplier archetype and mismatch class is tested with chi-square.

Introduction

GST replaced a web of central and state levies with a credit chain: each registered buyer can deduct the tax charged on its inputs, so the tax is intended to fall finally on consumption. The credit chain, however, is only as strong as the weakest supplier's filing. Since January 2022 the buyer's availment is confined to the invoices that appear in GSTR-2B, the static statement generated from suppliers' GSTR-1/IFF filings, and Rule 36(4) caps availment accordingly. A supplier who files late, under-reports, or drifts into composition silently transfers cost to the buyer — first in cash flow, then in interest and, ultimately, in unwound credit.

Review of literature (summary)

The compliance-burden literature on GST in India is mostly of two kinds: survey-based studies of taxpayers' perceptions, and doctrinal commentaries on Section 16 case law. Industry bodies and professional institutes periodically estimate compliance hours, but at the level of broad averages. Gap: few studies work at invoice level with the actual rule text, showing precisely how each condition produces deferred or lost credit and what the corresponding reconciliation activities cost in time. A rule-coded simulation of a single, fully specified firm makes the mechanism visible and verifiable.

Existing approach vs proposed approach

  • Existing practice in projects: descriptive write-ups of GST procedures, or questionnaire studies of awareness and difficulties, without quantified outcomes.
  • Proposed: an invoice-level simulation in which every availed, deferred, reversed and blocked rupee of credit is traceable to a coded rule and a synthetic source document, plus a workload model comparing two ways of running the monthly reconciliation.

Feasibility

  • Data: entirely synthetic; the invoice generator and archetypes are built by the student from stated assumptions, so no real company's confidential data is used or needed.
  • Law: every rule is public — the CGST Act and Rules on official portals — and each engine row cites its section or rule number.
  • Tools: Excel and Tally available in any commerce lab; SPSS or Jamovi for the chi-square test.
  • Time: sixteen weeks within Semester 4, including the three internal presentations.

Objectives

  1. 01To codify the eligibility and procedural conditions for input tax credit — Section 16 conditions including 16(2)(aa) and 16(4), Rule 36(4), Rule 37 and Section 17(5) — into a transparent, citable rule table.
  2. 02To construct a modelled mid-size manufacturing company with a twelve-month synthetic invoice population spanning three supplier-compliance archetypes.
  3. 03To apply the rule engine to every purchase invoice and classify each as availed, deferred, reversed (Rule 37) or blocked (Section 17(5)), mapping outcomes to the Table 4 heads of GSTR-3B.
  4. 04To measure the value and causes of ITC deferred or lost by month and by supplier archetype.
  5. 05To estimate the man-hours and cost of the monthly reconciliation under a manual process and under a template-assisted process, from stated activity-time assumptions.
  6. 06To test the association between supplier archetype and mismatch class using cross-tabulation and the chi-square test.
  7. 07To recommend supplier-segregation, follow-up and documentation practices that protect credit at the least workload.

Scope

In scope

  • One modelled company (fictitious), twelve months of synthetic transactions, regular-registered purchase and supply transactions in one state, with the rule engine limited to the named CGST provisions.
  • Monthly GSTR-2B-based reconciliation, Rule 37 ageing and reversal, Section 17(5) blocking, GSTR-3B Table 4 mapping, and a full-year GSTR-9-style summary reconciliation.
  • Workload costing of two defined processes from stated assumptions; chi-square analysis of archetype versus mismatch.

Out of scope

  • Real company or live portal data; no actual GSTR filing.
  • Integrated goods and services tax, imports and input service distributor mechanics.
  • Litigation and case-law analysis beyond the plain text of the cited provisions.
  • Anti-profiteering, refund processes and e-way-bill logistics.

Methodology

Research design

Quantitative, rule-based simulation using secondary legal material and synthetic primary data; analytical-comparative in the M.Com tradition, with a statistical test of association.

Step 1 — Rule table (weeks 1–3)

Each condition is written as an IF-THEN rule with its citation: R1 Section 16(2)(a) — valid tax invoice; R2 Section 16(2)(b) — goods received; R3 Section 16(2)(aa) — invoice in GSTR-2B; R4 Rule 36(4) — availment capped at GSTR-2B credit; R5 Section 16(4) — claim by 30 November following the year-end; R6 Rule 37 — reversal if supplier unpaid after 180 days, re-credit on payment; R7 Section 17(5) — blocked credits (motor vehicles, club membership, works-contract immovable property inputs). The table states each rule's data requirement, so the invoice fields fall out of the law itself.

Step 2 — Modelled company and invoice population (weeks 4–6)

The firm: fictitious Vaigai Precision Components Private Limited, Tamil Nadu, aggregate turnover ₹25 crore (above the ₹5 crore e-invoicing threshold), monthly purchases ₹1.6 crore at 18 per cent GST. Thirty-six suppliers are assigned archetypes: A (24 suppliers, GSTR-1 filed within the 11th of the following month), B (8 suppliers, GSTR-1 delayed 1–8 weeks at random), C (4 suppliers, composition or unregistered, with no credit on those invoices). Purchase lines carry date, supplier, HSN block, taxable value, GST rate, payment date (drawn from a lag distribution calibrated so roughly 3 per cent of payments cross 180 days), and a flag for blocked-credit items. Sales lines (about 480, all e-invoiced with IRN reference) carry similar fields. Ten per cent of the population is regenerated and re-checked for internal consistency.

Step 3 — GSTR-2B simulation and rule engine (weeks 7–9)

Each month, supplier A and B invoices that the archetype says were filed enter the simulated GSTR-2B; B invoices filed after the statement's cut-off slip to the next month. The Excel rule engine evaluates R1–R7 per invoice and stamps a status: availed, deferred (next 2B), reversed (Rule 37), blocked, or lapsed (Section 16(4)). Deferred credit is tracked until it enters a later 2B or lapses at the time limit.

Step 4 — Workload model (weeks 10–11)

Six reconciliation activities (download and map 2B; line match; supplier follow-up; Rule 37 ageing tracker; reversal-and-reclaim entries; 3B preparation) carry time estimates per 100 invoices from published benchmarking and the student's own pilot run in the college lab; these assumptions are stated and later sensitivity-tested. Two scenarios are costed monthly: S1 manual matching, S2 template-assisted matching with a keyed supplier master and exception list.

Step 5 — Analysis and testing (weeks 12–13)

Descriptives: value of ITC by status by month; cause-wise deferred credit. The chi-square test (α = 0.05, in SPSS/Jamovi) examines H1₀: supplier archetype is not associated with mismatch class (missing-in-2B versus amount-verified). A sensitivity table re-runs the workload model at ±25 per cent time estimates.

Timeline (16 weeks)

Weeks 1–3 rule table and review · 4–6 population build · 7–9 engine and 2B simulation · 10–11 workload model · presentations 1–3 at weeks 4, 9 and 13 · 12–14 analysis and writing · 15–16 corrections, binding, viva.

Research design

1 diagram · 6 tools · 2 min read

  • MS Excel (rule engine, reconciliation and workload model)
  • Tally Prime (purchase and sales register simulation)
  • GST portal GSTR-2B statement format (official user manual as the template)
  • CGST Act, 2017 and CGST Rules, 2017 — rule-coding worksheet with citations
  • IBM SPSS / Jamovi (cross-tabs, chi-square)
  • Invoice-population generator workbook and data dictionary

The study is a pipeline from law to numbers: every figure in the results sheet is traceable to a rule row and a synthetic invoice.

flowchart TD
  A["CGST Act and Rules on official portals"] --> B["Rule table R1-R7 with citations"]
  B --> C["Data dictionary: invoice fields from the rules"]
  C --> D["Invoice population: 720 purchases, 480 sales, 12 months"]
  D --> E["Supplier archetypes A, B, C"]
  E --> F["Simulated monthly GSTR-2B statements"]
  D --> G["Tally purchase and sales registers"]
  F --> H["Excel rule engine R1-R7 per invoice"]
  G --> H
  H --> I{"Status per invoice"}
  I -->|availed| J["ITC availed by month"]
  I -->|deferred or lapsed| K["Deferred and lost credit by cause"]
  I -->|reversed Rule 37| L["Reversal and re-credit tracker"]
  I -->|"blocked s.17(5)"| M["Blocked-credit register"]
  H --> N["Workload model: S1 manual vs S2 template, man-hours"]
  J --> O["Cross-tab and chi-square: archetype x mismatch"]
  K --> O
  O --> P["Findings and recommendations"]

Excel workbook design

Sheet 1 Assumptions (firm profile, archetype probabilities, payment-lag distribution, time estimates) · Sheet 2 Suppliers (archetype, filing behaviour) · Sheet 3 Purchases (one row per invoice, 12 months) · Sheet 4 Sales · Sheet 5 GSTR-2B-Sim (monthly statements generated from archetypes) · Sheet 6 RuleEngine (R1–R7 columns, one status per invoice, each header citing its provision) · Sheet 7 ITC-Ledger (availed, deferred, reversed, blocked, lapsed by month) · Sheet 8 Workload (activity × volume × minutes, two scenarios) · Sheet 9 Dashboard (monthly charts and the chi-square contingency table export).

Rule-engine extract (illustrative)

RuleProvisionTestStatus assigned
R3Section 16(2)(aa)invoice absent from current 2Bdeferred
R4Rule 36(4)availment exceeds 2B creditcapped
R6Rule 37payment age > 180 daysreversed, re-credit on payment
R7Section 17(5)(a)/(d)motor car, club, works-contract inputblocked

Work packages

5 packages

  1. Package 01

    Rule table and legal frame

    Builds the seven-rule engine from the CGST Act and Rules with exact citations, states each rule's data requirements, maps outcomes to GSTR-3B Table 4 heads, and summarises the pre-2022 Rule 36(4) regime to explain what changed when GSTR-2B became the binding cap.

  2. Package 02

    Modelled company and synthetic invoice population

    Specifies the fictitious firm's profile and e-invoicing position, generates twelve months of purchase and sales invoices with three supplier archetypes and a calibrated payment-lag distribution, and documents every assumption in a data dictionary with a ten per cent consistency re-check.

  3. Package 03

    GSTR-2B simulation and rule engine

    Generates each month's GSTR-2B from the archetype filing behaviour, applies rules R1–R7 to every purchase invoice in Excel, stamps statuses, and tracks deferred credit month to month until availed, reversed or lapsed under the Section 16(4) time limit.

  4. Package 04

    Workload and cost model

    Values the compliance work: six reconciliation activities, volumes derived from the invoice population, time-per-100-invoice assumptions stated and sensitivity-tested, and two monthly scenarios (manual versus template-assisted) compared in man-hours and rupee cost.

  5. Package 05

    Statistical analysis and recommendations

    Cross-tabulates supplier archetype against mismatch class, tests association with chi-square in SPSS/Jamovi, presents monthly ITC-flow charts and the deferred-credit waterfall, and derives supplier-segregation and follow-up recommendations that protect credit at least workload.

Slides

12 slides · titles free · bullets, notes and the .pptx unlock

  1. Slide 1

    Input Tax Credit under GST: A Compliance-Workload Study

  2. Slide 2

    Why ITC compliance matters

  3. Slide 3

    The legal frame: conditions that bite

  4. Slide 4

    The gap this study fills

  5. Slide 5

    Research design

  6. Slide 6

    Modelled company

  7. Slide 7

    The rule engine

  8. Slide 8

    Results — credit outcomes

  9. Slide 9

    Results — workload and cost

  10. Slide 10

    Statistical test

  11. Slide 11

    Findings and recommendations

  12. Slide 12

    Conclusion and future scope

Bullets, speaker notes and the .pptx · ₹999

The titles above are the real outline. The rest is what you present from.

Unlock for ₹999

Viva questions & answers

3 of 15 answered free · 12 unlock

Read each answer, close it, and say it in your own words. Your viva will ask. Now you'll know.

  1. 01Concept

    What is input tax credit and why is it the heart of GST?

    Input tax credit is the deduction a registered taxpayer takes of the GST charged on its purchases against the GST it owes on its supplies, so tax falls only on value added at each stage. It is the heart of GST because it removes the cascading of the earlier regime, but it works only when the whole chain files correctly, which is exactly why the law attaches conditions to it.

  2. 02Concept

    State the eligibility conditions in Section 16(2) and why 16(2)(aa) matters to the buyer.

    The buyer must possess a valid tax invoice, must have received the goods or services, must have paid the supplier within 180 days, and the supplier must have paid the tax to the government; under Section 16(2)(aa), added with effect from October 2022, the supplier's invoice must also be communicated in the buyer's GSTR-2B through the supplier's GSTR-1 or IFF. This last condition makes the buyer's credit depend directly on the supplier's filing behaviour, which is the premise of my study.

  3. 03Concept

    What is GSTR-2B and how does it differ from GSTR-2A?

    GSTR-2B is a static, auto-drafted ITC statement generated on the fourteenth of each month from a supplier's GSTR-1 and IFF filings, and it does not change afterwards; GSTR-2A is a dynamic statement that keeps updating with every supplier action. Since the January 2022 tightening of Rule 36(4), availment is confined to what appears in GSTR-2B, which is why my simulation generates month-wise 2B statements rather than a continuously updating file.

+12 more questions, with answers

Try the free ones out loud first. Your examiner will not accept “it's in the PPT”.

How to reproduce the study

8 steps · unlocks with the project

Unlocks with the project · ₹999

8 steps

Every step to carry the project out with the tools in the tech stack, in order.

Unlock for ₹999

READMEFIRST

238 words · unlocks with the project

What to change before it goes anywhere near a submission. Skipping it is how the demo fails live.

Unlocks with the project · ₹999

238 words · ~1 min read

The checklist of things to rename, re-seed and re-think so the project reads as yours.

Unlock for ₹999

Instructions

342 words · unlocks with the project

How to study it, adapt it and walk your examiner through it, step by step.

Unlocks with the project · ₹999

342 words · ~2 min read

Report structure, formatting rules and the submission checklist your department will grade.

Unlock for ₹999

References

6 sources

  1. Central Board of Indirect Taxes and Customs — CGST Rules, 2017, Rule 36 (documentary requirements and conditions for claiming ITC), official tax-information portal
  2. GST Portal — User manual: viewing and downloading Form GSTR-2B (auto-drafted ITC statement)
  3. The Central Goods and Services Tax Act, 2017 — India Code, official repository of central Acts
  4. Goods and Services Tax portal — registration, returns and services (official)
  5. Datey, V. S. — Indirect Taxes Law and Practice (latest edition), Taxmann, New Delhi
  6. University of Madras — PG Common Regulations (CBCS)

Cite this bundle

OnlyProjects. (2026). Input Tax Credit under GST: A Compliance-Workload Study of a Modelled Mid-Size Manufacturing Company: M.Com Accounting & Finance project bundle [Educational resource]. https://onlyprojects.online/projects/mcom-accounting-gst-input-tax-credit-compliance-workload-study

Future scope

1 min read

  • Extend the engine to multi-state supplies, imports and input-service distribution, where credit flows through additional forms.
  • Add an interest module under Section 50 on wrongly availed credit, valuing the cost of aggressive availment.
  • Build the GSTR-9 and GSTR-9C annual reconciliation layer and measure the year-end catch-up workload.
  • Convert the archetype behaviour into a Monte Carlo model to produce confidence bands for deferred credit rather than single figures.
  • Survey a small panel of real accountants (anonymously) to validate the activity-time assumptions against practice.

Keep browsing

Same degree, same syllabus slot, different idea. Pick the one your guide will actually approve.