Hindon Pressparts recruits about 150 shop-floor joiners a year: contract operators through two licensed contractors, ITI-qualified trainees on its own rolls, and apprentices engaged under the national apprenticeship scheme. Over the last twelve months, 41 of 148 joiners (27.7%) left within 90 days. Most of them left the press shop and weld shop, where takt pressure, heat and night shifts are highest.
The plant's onboarding ends, in practice, at lunch on the first day. After a compliance-heavy induction the joiner is handed to a line supervisor who is measured on output, not on how settled the new operator is. HR therefore cannot say which part of onboarding is failing: whether joiners do not understand their role and wage terms, do not get a buddy, do not feel accepted by the line, or simply find a job closer to home. Exit reasons in the register are too vague to act on.
There is a need for a structured, stage-wise look at onboarding as joiners themselves experience it, read alongside the exit data and the supervisors' view, so that HR can target its limited time and budget at the one or two changes most likely to reduce early exits.
Abstract
This Summer Training Project studies a fictional Greater Noida auto-component plant, Hindon Pressparts Pvt. Ltd., in two parts. The first part is an organisation study: profile, departments, HR processes and a SWOT and McKinsey 7S analysis. The second is a small HR study of how shop-floor new joiners are onboarded and why so many leave in their first 90 days. Using Bauer's four-C framework, a bilingual questionnaire (n = 72), twelve months of joining and separation records (148 joiners) and six supervisor interviews, the study finds where the onboarding chain is weakest and recommends low-cost fixes.
Introduction
India's auto-component industry runs on a large, young and mobile shop-floor workforce. In plants around Noida, Greater Noida and Ghaziabad, operators and ITI trainees move between factories for a few hundred rupees a month, a shorter commute or a better shift. For a mid-size supplier that has to hold OEM delivery schedules and IATF 16949 quality requirements, every operator who leaves in the first three months is a lost training investment and a quality risk on the line.
At the host plant, HR runs a half-day induction on the first morning: documents, EPF and ESI forms, safety shoes, a video on the plant's quality policy and a walk to the shop. After that, the joiner belongs to the line supervisor. Of the 148 people who joined in the twelve months before the internship, 41 (27.7%) left within 90 days.
Existing practice and the gap
- Induction is strong on compliance (forms, PPE, rules) but there is no written plan for the first 30, 60 or 90 days.
- A buddy system exists on paper, but HR has no record of whether a buddy was actually assigned.
- Exit reasons are captured in a single register column, often as "personal".
- Onboarding studies in the HRM literature mostly cover IT and white-collar joiners. Very little looks at contract and apprentice operators in a mid-size Indian manufacturing plant, which is exactly where early exits hurt most.
Proposed study
Measure each onboarding stage (pre-joining, Day 1, first 30 days, 30–90 days) against Bauer's four Cs. Compare scores across joiner categories. Read the exit register for patterns, and combine all three sources into a short action plan for the HR team.
Feasibility
The HR head agreed to give access to anonymised registers and to schedule survey sessions at shift change. The questionnaire takes about twelve minutes, Excel is enough for the analysis, and the whole study fits inside weeks 2–7 of an eight-week placement without pulling the trainee out of the department rotation.
Research design: descriptive single-case study inside an eight-week placement, combining a cross-sectional survey, secondary analysis of HR registers and short qualitative interviews.
Population and sample: all 148 shop-floor joiners of the previous twelve months. The 107 still employed were invited to fill the questionnaire at shift change, and 72 did (67% response). The 41 early leavers are studied only through the separation register. Six line supervisors (press shop, weld shop and machining, two each) were interviewed.
Instrument: a 26-item bilingual (Hindi and English) questionnaire. Section A covers the profile, Sections B–F rate onboarding statements on a 5-point agreement scale grouped by the four Cs, and Section G holds two open questions. Items were read aloud for respondents who preferred it, and a pilot with eight trainees in week 3 led to four items being reworded.
Analysis plan: frequencies and percentages for the profile; mean and standard deviation for each C; cross-tabulation of the Connection score band (low/high) by joiner category; a chi-square test of independence (Excel CHISQ.TEST); and 90-day exit rate = leavers within 90 days ÷ joiners in the period, by category and department.
| Phase | Weeks | Activity | Output |
|---|
| Orientation | 1 | Induction, HR policy manual, plant walk | Org-profile notes |
| Design | 2 | Literature, framework, questionnaire draft | Approved questionnaire |
| Pilot and rotation | 3–4 | Pilot (n = 8); production, quality, stores | Final tool; dept notes |
| Fieldwork | 4–6 | Survey at shift change; registers; interviews | Raw data in Excel |
| Analysis | 7 | Tables, chi-square, themes | Findings draft |
| Close-out | 8 | Presentation to HR head; report draft | Feedback and report |
Ethics: written permission from the HR manager, verbal consent from each respondent, no names or codes on any sheet, and the firm's name disguised in the bound report wherever the institute requires it.