Pinned
@check-in-wait-time-guest-satisfaction-pms-survey
1 min
Overview
Check-in is the first real service moment of a hotel stay, and for business travellers arriving after a flight it is also the moment patience is shortest. This industrial-training project measures how long guests actually wait at check-in at a fictional 150-room business hotel, The Meridian Grove, Hyderabad, and how that wait relates to their satisfaction with the front office.
The study combines two kinds of data. First, objective timings: anonymised arrival and check-in timestamps exported from the hotel's property management system (Opera / IDS-class PMS), supplemented by stopwatch observation of queue time (guest joins the queue → reaches the desk) and processing time (desk → key handed over). Second, a SERVQUAL-based guest questionnaire covering the five service-quality dimensions — tangibles, reliability, responsiveness, assurance and empathy — plus overall satisfaction and intention to recommend.
About 150 guests are surveyed over four weeks across peak (12:00–15:00 and 19:00–22:00) and off-peak slots. In Excel the trainee builds pivot tables of wait time by hour, day and booking source (walk-in, OTA, corporate, travel agent), compares satisfaction across wait-time bands, and computes the correlation between waiting time and satisfaction. The report closes with practical recommendations such as pre-registration for expected arrivals, a floater during flight-arrival peaks and express check-in for repeat corporate guests. It is a realistic, beginner-friendly BHA402 project that uses data every hotel already has.
Syllabus alignment
NCHMCT · NCHMCT-JNU
BHA401 / BHA402 · Industrial Training Feedback Appraisal + Project Report · Semester 4 · 20 credits · 200 + 100
- Subjects this project applies
- Front Office Operations — guest cycle, registration and check-in procedures
- Property Management System practicals — arrivals, registration, reports
- Hospitality Marketing — service quality and guest satisfaction
- Research and statistics for hospitality — questionnaire and Excel analysis
- How it is evaluated
See your department's project guidelines.